Nov. 17, 2026
Here are new details about changes on VCU’s MCV Campus
Share this story
As Virginia Commonwealth University and VCU Health continue preparation for two major construction projects — a new VCU School of Dentistry building and a proposed VCU Health inpatient tower — new details are now available regarding upcoming changes on the MCV Campus.
MCV Campus Recreation Center
On Nov. 25 at 4 p.m., the MCV Campus Recreation Center, an indoor facility in the Jonah L. Larrick Student Center, will close permanently.
Larrick is slated for demolition in February 2027 because it will be the site of a five-story, 308,000-square-foot School of Dentistry building that will include classrooms, academic offices, cutting-edge academic laboratories and clinics for predoctoral, dental hygiene and specialty dentistry programs, aligning with modern practices in dental education.
The MCV Campus Rec Center will move to 601 N. 10th St., the current site of the MCV Campus Bookstore. The recreation center is planned to reopen in summer 2027. During the spring semester, while the new RecWell space is being renovated, no recreation services will be available on the MCV Campus.
However, students will continue to have access to the Cary Street Gym on the Monroe Park Campus, and they can use VCU’s RamsXpress point-to-point shuttle service between campuses Monday-Friday, 7 a.m. to 7 p.m., with travel times of 10-15 minutes. The Monroe Park Campus stop is located outside James Branch Cabell Library, and the MCV Campus stop is located outside Jonah L. Larrick Student Center.
The new MCV Campus fitness center will have approximately 3,000 square feet and will feature cardio and weight equipment, a functional fitness space and cabana-style restrooms and showers. Programmatically, RecWell will continue to offer its popular personal training and small group training at this location.
RecWell has communicated the upcoming changes directly to its members.
Jonah L. Larrick Student Center
On Dec. 11 at 4 p.m., Larrick, including Jonah’s Express grab-and-go dining and Starbucks, will close permanently to prepare for the building’s demolition in February. Furniture will begin to be removed from Larrick between Nov. 25 and Dec. 11.
VCU is exploring food options to continue serving MCV Campus students during the interim.
New spaces to study
In addition to study spaces in the relocated Health Sciences Library, James Branch Cabell Library on the Monroe Park Campus has ample study space, including more than 50 study rooms that may be reserved online. All graduate students also have key card access to the Graduate Student and Faculty Reading Room on Cabell’s fourth floor. Cabell hours of operation can be found here.
Starting Jan. 1, 2027, students can also use the following MCV Campus spaces for studying, eating and small group sessions, which are available on a first-come, first-served basis and cannot be reserved.
Kontos Medical Sciences Building
1217 E. Marshall St.
First floor, Room 104-105
Hours: Monday-Friday, 6 a.m.-6 p.m.
Sanger Hall
1101 E. Marshall St.
Eighth Floor, Room 8-036
Hours: Monday-Friday, 5 p.m.-7 a.m.; Saturdays and Sundays, 24 hours
VCU’s RamsXpress provides convenient point‑to‑point shuttle service between campuses. The Monroe Park Campus stop is located outside Cabell Library, and the MCV Campus stop is located outside Larrick Student Center.
MCV Campus Bookstore
A new bookstore location and timeline have not yet been determined. Barnes & Noble @ VCU on the Monroe Park Campus remains available.
Barnes & Noble will be hosting a pop-up shop in January 2027 where students can pick up their books and shop for VCU gear. More information will be provided as details are confirmed.
For more details on the upcoming changes on the MCV Campus, including previously announced changes regarding the Health Sciences Library, Hunton Student Center and more, visit this FAQ.
Subscribe to VCU News
Subscribe to VCU News at newsletter.vcu.edu and receive a selection of stories, videos, photos, news clips and event listings in your inbox.